Construction Start: Pulp & Paper - JELF OCT 2022, Von Sperber
Please be advised that FMAS Operations, Southeast Sector, will carry out the following project:聽22-029 PULP & PAPER - JELF OCT 2022, Von Sperber
Description:聽To carry out electrical works between Lab 202 and existing electrical panel in 2-Hall1
Construction start date:聽November 4, 2024.
Planned construction end date:聽November 30, 2024
Construction Start: Wong 鈥 Mezzanine renovation
Please be advised that 91社区 has mandated Corenov Constructeurs to carry out the following project:聽22-028 Wong 鈥 Mezzanine renovation
Description:聽Renovations to 3M055 and office 3M030 to create one new lab space.
Construction start date:聽September 2024
Planned construction end date: February 2025
Construction start: MNI (Neuro) - CFI JELF room 254 renovation
Please be advised that 91社区 has mandated ISI Construction Inc. to carry out the following project:聽23-117 MNI (Neuro) - CFI JELF room 254 renovation
Description:聽Renovation of room 254 (incl. new interior finishes, upgrade of electromechanical services) to accommodate research needs.
Construction start date: September 11, 2024
Planned construction end date: November 15, 2024
Construction start: Lyman Duff New Wing 鈥 Priority building envelope repairs
Please be advised that 91社区 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽22-033 Lyman Duff New Wing (B169) 鈥 Priority building envelope repairs
Description:聽Repair/replacement of damaged bricks & wall at the back of the building, adjacent to tunnel between MNI and Duff, up to the delivery dock of the Lyman Duff Building.
Construction start date:聽September 3rd, 2024
Construction start: Raymond (Macdonald Campus)鈥 JELF Dastmalchi (Lot 1)
Please be advised that 91社区 has mandated Corenov Construction to carry out the following project:聽21-002 Raymond (Macdonald Campus) 鈥 JELF Dastmalchi (Lot 1)
Description:聽Renovation of room R1-038 and partial renovation of room R1-037.
Construction start date: August 12th, 2024
Planned construction end date: September, 2024
Work schedule: Monday to Friday, 6 a.m. to 3 p.m.
Construction start: Strathcona Anatomy and Dentistry 鈥 Prototype for masonry restoration
Please be advised that 91社区 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽21-099 Strathcona Anatomy and Dentistry - Prototype for masonry restoration
Description:聽Phase 2 of the renovation associated to the study aimed at confirming the condition of the masonry walls and identifying a strategy to renovate the building envelope.
Construction start: Burnside Hall 鈥 10th floor offices
Please be advised that 91社区 has mandated Les Entreprises N.R. Brosseau inc. to carry out the following project:聽20-201 Burnside Hall 鈥 10th floor offices
Construction start: Redpath Hall 鈥 Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.
Please be advised that 91社区 has mandated Mongrain Inc. (Lot 1) and Couverture Montr茅al-Nord (Lot 2) to carry out the following project:聽22-019 Redpath Hall 鈥 Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.
Description:聽The project consists of the first two lots (Lot 1, Foundation Repair, and Lot 2, Roof Repair) of the Redpath Hall building envelope rehabilitation project.
Construction start: Redpath Library, McTavish Wing 鈥 Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair
Please be advised that 91社区 has mandated Mongrain Inc. (Lot 1) and Couverture Montr茅al-Nord (Lot 2) to carry out the following project:聽22-018 Redpath Library, McTavish Wing 鈥 Rehabilitation of Building Envelope - Lot 1, Repair and waterproofing of foundations, and Lot 2, Slate roof repair.
Construction start: Macdonald-Stewart - Upgrade Fire Suppression System LOT 1A
Please be advised that 91社区 has mandated Gicleurs Moderne Inc. to carry out the following project:聽24-001 Macdonald Stewart - Upgrade Fire Suppression System LOT 1A (work in 3 laboratories).
Description:聽Installation of the main sprinkler line in the ceiling of three teaching laboratories located in the basement level of Macdonald-Stewart Building #446.
Construction start date: June 20, 2024
Construction start: McLennan Library 鈥 Convert 25kv distribution switches
Please be advised that 91社区 has mandated La Cie 脡lectrique Britton Lt茅e to carry out the following project:聽17-160 McLennan Library 鈥 Convert 25kv distribution switches.
Construction start: Royal Victoria College (RVC) Residence - Masonry work
Please be advised that 91社区 has mandated Atwill-Morin Ma莽onnerie to carry out the following project:聽22-036 (RVC Residence - B180) - Restoration of rendering on rear fa莽ades
Description:聽The project involves restoring the rendering on the rear fa莽ades of the Royal Victoria College (RVC), a student residence building, located on University Street.
Construction start date: July 2nd, 2024
Construction start: McCall MacBain Arts 鈥 Replacement of fire curtain between Arts and Leacock buildings
Please be advised that 91社区 has mandated Corenov Constructeurs Inc. to carry out the following project:聽21-058 McCall MacBain Arts 鈥 Replacement of fire curtain between Arts and Leacock buildings.
Description:聽Replacement of fire curtain between McCall MacBain Arts and Leacock buildings.
Construction start date: June 25th, 2024
Planned construction end date: October 2024
Construction start: Arena McConnell Upgrade - Lot 2
Please be advised that 91社区 has mandated DEVCOR to carry out the following project:聽18-156 McConnell Arena upgrade 鈥 Lot 2
The project consists of upgrading the electrical infrastructure to enable the replacement of the ice-making system, which will allow the arena to remain open for a longer portion of the year. The project also includes the modernization of sections of the ventilation and cooling systems.
Construction Start: Replacement of steam and condensate pipes between Raymond and CINE, Macdonald Campus
Please be advised that 91社区 has mandated M茅canicAction to carry out the following project:聽21-050 Replacement of steam and condensate pipes between Raymond and CINE, Macdonald Campus
Description:
Replacement of steam and condensate pipes between Raymond and CINE
Construction start date: June 12th, 2024
Planned construction end date: August 2024