91ÉçÇø

Nouvelles

Construction Start: Bronfman Building - Parking infrastructure

±Ê³Ü²ú±ô¾±Ã©: 17 May 2023

91ÉçÇø has mandated Concreate Construction to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.

The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.

Project manager:ÌýAndré Labelle -Ìýandre.labelle [at] mcgill.ca

Assistant project manager:ÌýMarcela Fernández Pedrozo -Ìýmarcela.fernandezpedrozo [at] mcgill.ca

Construction start date:ÌýMay 29, 2023

Planned construction end date:ÌýEnd of August 2023

Work schedule:ÌýMonday to Friday, 7 a.m. to 3 p.m.

Scope of work:Ìý

Repair of the existing ramp and temporary relocation of surface conduits. Reparations under the ramp and at storm water drains, to solve water infiltration issues. Removal of the existing parking equipment and installation of new infrastructure for upgraded parking equipment.

Impact:

The garage will be closed during construction. Computer lab 010 on the B1 level will be inaccessible during the reparations of a drain located on top of the ceiling. There will be noise during demolition and less intense during construction. Circulation of the public alley and the two parking spaces behind Armstrong might be temporarily impacted during specific dates of delivery.

Back to top